For EORs and design firms
Review submitted drawings faster, with the evidence to back every comment.
StructAll compares shop drawings, submittals, and revisions against the contract documents, surfaces what changed or is missing, and links every finding to its source — so construction-administration review is faster, more consistent, and defensible.
The problem
Construction-phase review is where the hours and the liability pile up.
- Manual shop drawing and submittal review across dense PDF sets
- Construction administration burden that never lets up
- RFIs that trace back to drawing conflicts
- Revisions that have to be re-checked, set against set
- Liability exposure and inconsistent review between reviewers
- Engineers spending too much time searching dense drawings
What you get
What StructAll gives your review team.
Compare shop drawings and submittals directly against the contract documents — grounded in which element answers which, not page position.
Surface changed details, missing components, and revision differences, each with the cropped evidence from both drawings.
Review submittals and stacked revisions without re-reading every sheet by hand each cycle.
Triage each finding — flag as an RFI, draft an evidence-backed review comment, resolve, or dismiss — every one traced to the page and crop behind it.
Reduce the repetitive parts of construction-administration review so engineers spend time on judgment, not searching.
Export an auditable review report — RFIs, comments, and the reasoning per call — to send back to the fabricator. The engineer of record signs off, not the model.
Get the 20-minute walkthrough
See StructAll run on a real comparison.
We'll walk you through a live review on real structural drawings — every delta, the agent answering your questions, and the evidence-backed report.